Phase 2
Beam Assembly (3 Circuit)
ILINE
90°/180° (4-Way) Post
Installation Guide
1
2
4
5
1
2
3
4
Place beam upside down on the floor to reveal the beam canal.
Take a junction block and snap in 2 G-type receptacles on one side.
Push the junction block against the inner wall of the beam with
the receptacles protruding out on the other side. Now insert the
C-type receptacles through the cut outs and snap it into place.
Position the junction block until the receptacles are evenly protruding
out on both sides of the beam.
Drop in the offset bracket on each end of the junction block as shown
in diagram. Use the 4 screws provided to mount the bracket in place.
5
3
NOTE:
G and C type
receptacles must be on opposite
sides of junction block.
C
G
Lower the junction block assembly into the beam canal with the
G-type receptacles facing downwards and then rotate the receptacle
in to the receptacle cut outs.(See below diagram)
4
21
Please contact
if you are missing any parts, have difficulty with assembly, or have any product related questions.
Содержание ILINE
Страница 1: ...ILINE power data beam Installation Guide...
Страница 3: ...ILINE installation guide 180 2 WAY...
Страница 10: ...ILINE installation guide 120 3 WAY...
Страница 17: ...ILINE installation guide 90 180 4 WAY...