3. Loose the screws of the upper package stand, take off the upper extension columns,
take out the parts in the inner column and remove the package stand.
4. Move aside the parts and check the parts according to the shipment parts list.
(See Fig.11, 12).
5. Open the bag 1 of parts and check the parts according to parts box list
(See Fig. 13).
6. Open the bag 2 of parts and check the parts according to parts bag list
(See Fig. 14).