16
2
.
High setting cable connection
2.1. Cable cross over from the bottom of the carriages and be pulled out from the
open of carriages, then screw the two cable nuts
(See Fig. 27).
High Setting
installation
holes
Cable
connecting
direction
Cable
Connecting
direction
Screw the two cable nuts
Fig. 27
Содержание OH-9
Страница 1: ...TWO POST LIFT Model OH 9 Original...
Страница 5: ...3 Swing and extending the arms to the lifting point of vehicle Fig 4...
Страница 19: ...17 2 2 Connecting cable for high setting See Fig 28 Fig 28 85 102 Cable 1 Cable 2 Cable 2...
Страница 20: ...18 91 30 89 90 88 91 86 87 87A K Install oil hose 1 Oil line connecting drawing See Fig 29 Fig 29...
Страница 27: ...25 IV EXPLODED VIEW OH 9 Fig 44...