10
F. Position columns
(See Fig. 18)
Position the columns on the installation layout of base-plate, Install the anchor bolts.
Check the Columns plumpness with level bar, and adjusting with the shims if the
columns are not vertical. Do not tighten the Anchor Bolts.
Drilling
Cleaning
Bolting
6
49
78
Width between Columns: 112-1/4”
Overall width
:
135”
3-
1/
2”
‘’
Note: Minimum embedment depth of anchors is 3-1/2”.
94
Fig. 18
Содержание OH-9
Страница 1: ...TWO POST LIFT Model OH 9 Original...
Страница 5: ...3 Swing and extending the arms to the lifting point of vehicle Fig 4...
Страница 19: ...17 2 2 Connecting cable for high setting See Fig 28 Fig 28 85 102 Cable 1 Cable 2 Cable 2...
Страница 20: ...18 91 30 89 90 88 91 86 87 87A K Install oil hose 1 Oil line connecting drawing See Fig 29 Fig 29...
Страница 27: ...25 IV EXPLODED VIEW OH 9 Fig 44...