B. Equipment storage and installation requirements.
The equipment should be stored or installed in a shady, normal temperature, ventilated
and dry place.
C. The equipment should be unload and transfer by forklift.
D. SPECIFICATIONS OF CONCRETE
(See Fig. 7)
Specifications of concrete must be adhered to the specification as following.
Failure to do so may result in lift and/or vehicle falling.
1. Concrete must be thickness 4” minimum and without reinforcing steel bars, and
must be dried completely before the installation.
2. Concrete must be in good condition and must be of test strength 3,000psi
minimum.
3. Floors must be level and no cracks.
E. POWER SUPPLY
The electrical source must be 3.0HP minimum. The source cable size must be 2.5mm²
and in good condition of contacting with floor.
Fig. 7
Concrete must be 3,000psi minimum
49
4”
Fig.6
Содержание OH-9
Страница 1: ...TWO POST LIFT Model OH 9 Original...
Страница 5: ...3 Swing and extending the arms to the lifting point of vehicle Fig 4...
Страница 19: ...17 2 2 Connecting cable for high setting See Fig 28 Fig 28 85 102 Cable 1 Cable 2 Cable 2...
Страница 20: ...18 91 30 89 90 88 91 86 87 87A K Install oil hose 1 Oil line connecting drawing See Fig 29 Fig 29...
Страница 27: ...25 IV EXPLODED VIEW OH 9 Fig 44...