
5 6 7 8 9 10 11 12 13 14
X1
15 16 17
101CH
01
Blue
51
YV11
13
11
X11
D-SUB
15P
S-311+ ACL
1-12 ACL
C - MACHINE INSTALLATION
Released: 01/2014
E-mail: [email protected]; webside: amfreece.com
Phone: +420 582 309 146; Fax: +420 582 360 606
2.1 FEED CABLE INSTALLATION FOR SWITCH VALVE OF CUTTING
1. Connect cable 06.1900.0.015 into marked terminal in electrobox.
2. Connect cable 06.1900.0.016 into valve connector
3. Fasten then opposite cable end into the plug on electrobox and lock with screws.
2.2 LPE CUTTING BLOCK INSTALLATION
Take out the existing cutting block supplied as standard with ACL
version, turn for 180°, so on left side (from operator view) on the block
was LPE sign seen. Fasten turned cutting block back to moveable
cutting block mechanism.
ACL-LPE variant
Standard variant