Installation
12
BOSS Scoring Bowler Terminal Consoles
Installation, Operation, Service, and Parts Manual
400-286-003 Rev. New
S
ETUP AND
T
ESTING
After completing the installation, perform the following steps to ensure proper operation.
1. Turn on BOSS Front Desk System so that to check software operation.
2. Turn on power at the main circuit breaker, turn on the associated pinspotters, and
verify that the bowler terminals operate properly.
3. Turn on the standard bowler terminal and verify that the keyboard works properly.
4. Type in your name on the bowler terminal keyboard. Wait to see if the system
responds correctly and display you name on the score grid of the overhead monitor
assembly.
5. If you purchased the intercom upgrade, test the system by pressing the intercom
button. Wait to hear a sound from the speaker.
6. If you purchased the LCD display, test the system by typing any message on the
screen. Check to see if the message is displayed correctly.
7. Turn on the lower monitor bowler terminal and that the keyboard works properly.
8. Verify that the monitors do not need to be adjusted.
9. If lower monitor adjustments are required, ensure that back cover is off the rear of
the bowler terminal.
10. To adjust the Horizontal alignment, look for the "H" on the control board and turn the
controls in a direction such that the horizontal alignment is set correctly.
11. To adjust the Vertical alignment, look for the "V" on the control board and turn it in a
direction such that the vertical alignment is set correctly. After the necessary
adjustment has been made, replace back cover on the bowler terminal and began to
bowl again.
12. After all tests have been performed satisfactory, place the standard and the lower
monitor bowler terminal in service for operation in the bowling center.