3-4 | Thermox WDG-V UOP IECEx/ATEX
Standard 1/4
"
NPT probe installation
Screw the probe into the back of the sample probe port on the rear of the
sensor, then mount the sensor - Figures 3-1a and 3-1b.
Sampling Probe
Exhaust
to Process
Mounting Flange
Assembly
Long Venturi
Gasket 3"-300#
Backplate part
of Sensor
TOP VIEW
Hook Inlet Tube
with RTD Flow Sensor
Exhaust Tube
Connector 1/2"T x 3/8NPT(M)
Figure 3-1a. WDG-V UOP Probe Installation.
Figure 3-1b. Rear of Sensor.
Содержание Thermox WDG-V UOP
Страница 34: ...2 6 Thermox WDG V UOP IECEx ATEX This page intentionally left blank...
Страница 65: ...AMEVision Display Installation Guide 4 5 Customer I O Connections...
Страница 68: ...4 8 Thermox WDG V UOP IECEx ATEX This page intentionally left blank...
Страница 80: ...5 12 Thermox WDG V UOP IECEx ATEX This page intentionally left blank...
Страница 85: ...Service and Parts 6 5 Cell Clips Cell Housing Washer Cell O Ring Hex Nut Figure 6 2 Cell replacement...
Страница 87: ...Service and Parts 6 7 Speed Clips Thermocouple Thermocoouple Figure 6 3 Thermocouple replacement...
Страница 91: ...Service and Parts 6 11 Box Heater Block Furnace Wires Heater Figure 6 6b Box Heater Replacement...
Страница 96: ...6 16 Thermox WDG V UOP IECEx ATEX This page intentionally left blank...