![Ametek LMM01 Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/ametek/lmm01/lmm01_original-operating-instructions_3044115018.webp)
Operation
— 18
SPECTROCHECK — 07.05.2015
7 Operation
7.1
Switching the instrument on
Note
If possible, never shut off the power supply and keep the argon supply always
open.
If the instrument was disconnected from the power supply for some time (overnight
or during the weekend) and/or removed from the argon supply, the instrument
must be stabilized for approx. 3 hours after switching it on.
If the instrument was disconnected from the power supply and/or removed from
the argon supply for some time (due to transport/storage), stabilization may require
a longer period of time after switching the instrument on after switching the
instrument on. In this case, additional important information can be found in
„SPECTROCHECK Instructions“ (F1/Help).
To switch on the instrument, proceed as follows:
1.
Connect the instrument to the power supply.
The operating system is started.
Once the operating system is booted, the spectrometer program "Spark
Analyzer Pro CHECK" starts.
The instrument is switched on.