122770 06
18-09-2007
57
The other end is bend 25mm from
the tip of the sensor and placed in
the sensor hole on top of the well.
After reinstalling both ends of the
sensor in the well, the wires must
be strapped together.
When a new sensor has been
installed, a new gasket has to be
installed on top of the well. The
new gasket is supplied with the
sensor kit.
L.
Replacement of Stirling Control PCB FPSC
(Exploded view – fig. 3.2, pos. 22)
ATC-125 A/B only:
Remove the 4 nuts holding the
PCB.
Carefully pull out the PCB.
Содержание JOFRA ATC-125
Страница 2: ...2 18 09 2007 122770 06 ...
Страница 74: ...74 18 09 2007 122770 06 3 3 Exploded View ATC 140 A B 0 35 1 JRL 03 01 2005 A3 ...
Страница 75: ...122770 06 18 09 2007 75 3 4 Exploded View ATC 155 A B ...
Страница 76: ...76 18 09 2007 122770 06 3 5 Exploded View ATC 156 A B ...
Страница 77: ...122770 06 18 09 2007 77 3 6 Exploded View ATC 157 A B ...
Страница 79: ...122770 06 18 09 2007 79 3 8 Exploded View ATC 320 650 A B ...