Installation and Start-Up
|
3-19
Connect the conductors that supply power and a ground source from
the Sample Probe to the appropriate terminals on the Temperature
Controller.
Connect the Sample Probe RTD wires to the appropriate terminals on
the Temperature Controller.
3. Complete the wiring from the analyzer to the Terminal Block in the
Probe Heater Junction Box (see Figure 3-3).
Tighten the screws to secure each wire to the appropriate Terminal
Block location in the Junction Box.
The procedure is complete.
Содержание ASR900
Страница 16: ...1 4 Heated Acid Gas Sample Probe Large Diameter Figure 1 2 HAG Sample Probe assembly drawing...
Страница 25: ...Specifications 2 5...
Страница 26: ...2 6 Heated Acid Gas Sample Probe Large Diameter...
Страница 27: ...Specifications 2 7...
Страница 28: ...2 8 Heated Acid Gas Sample Probe Large Diameter...
Страница 29: ...Specifications 2 9...
Страница 52: ...3 22 Heated Acid Gas Sample Probe Large Diameter This page intentionally left blank...
Страница 59: ...Maintenance 4 7 Figure 4 1 Large Diameter Heated Acid Gas Sample Probe Assembly...
Страница 80: ...4 28 Heated Acid Gas Sample Probe Large Diameter This page intentionally left blank...
Страница 86: ...6 2 Heated Acid Gas Sample Probe Large Diameter Heated Acid Gas Sample Probe Assembly 100 2196...
Страница 88: ...6 4 Heated Acid Gas Sample Probe Large Diameter Double Block Valve Assembly 100 2393 SEE NOTES 1 2...
Страница 89: ...Drawings 6 5 Fiber Filter Assembly 100 2194...
Страница 90: ...6 6 Heated Acid Gas Sample Probe Large Diameter This page intentionally left blank...
Страница 92: ...S 2 Heated Acid Gas Sample Probe Large Diameter This page intentionally left blank...