Fixed Thermal Imaging System
Installation Guide
Contents
Fig. 2 FTI-E Rugged Enclosure Mounting Dimensions
Fig. 3 SDS-E Rugged Enclosure Mounting Dimensions
Fig. 4 FTI-E PSU Mounting Dimensions
Fig. 5 FTI-E Blower Mounting Dimensions
Fig. 6 FTI-E Camera Installation Dimensions
Fig. 7 FTI-E Cable Requirements
Fig. 8 FTI-E PSU Electrical Connection Details
Fig. 9 Blower Electrical Connection Details
Fig. 10 NUDAM I/O Electrical Connection Details
Fig. 11 FTI-E Remote PC Electrical Connection Details
Fig. 12 Water Connection Details
Fig. 13 Air Connection Details
A1 About the SDS-E Slag Detection System
A2 Slag Detection System Specifications
Содержание Fti-E
Страница 4: ...Fixed Thermal Imaging System Installation Guide ...
Страница 6: ...Fixed Thermal Imaging System Installation Guide ...
Страница 12: ...Section 2 Page 2 2 Fixed Thermal Imaging System Installation Guide Fig 1 FTI E System Overview ...
Страница 18: ...Section 2 Page 2 8 Fixed Thermal Imaging System Installation Guide Fig 7 FTI E Cable Requirements ...
Страница 28: ...Appendix A Page 4 Fixed Thermal Imaging System Installation Guide ...