User Guide
4 - 8
Particulate Measurement System
4750-PM
Fig. 4-3 Sensor connections label for mains versions (inside enclosure lid)
2) Note the label on the power supply cover (see Fig. 4-4 below).
3) Referring to item 2, Fig. 4-2, undo the 2 off screws and remove the
power supply cover.
Mains Pin Connections (L-R)
L
Live
PE
Protective Earth (GND)
N
Neutral
4) Route the power supply cable through the right-hand cable gland and
connect to the mains power terminals as outlined in the following table.
5) Replace and secure the power supply cover.
6) Close the enclosure lid and secure with the 4 off screws. Do not over-
tighten.
7) Switch ON power to the sensor, then proceed to carrying out the
Power-up Quick Check
(See Section 4.6).
Fig. 4-4 Sensor mains supply label
Содержание 4750-PM
Страница 4: ...Particulate Measurement System User Guide 4750 PM Blank...
Страница 6: ...INTRODUCTION 1...
Страница 11: ...TECHNICAL DATA 2...
Страница 15: ...2 3 User Guide Particulate Measurement System 4750 PM...
Страница 18: ...PRODUCT DESCRIPTION 3...
Страница 24: ...INSTALLATION 4...
Страница 36: ...OPERATION 5...
Страница 43: ...5 7 User Guide Particulate Measurement System 4750 PM Fig 5 2 Engineering Menu...
Страница 53: ...MAINTENANCE 6...
Страница 59: ...RESETTING THE SENSOR 7...
Страница 61: ...GENERAL NOTICES 8...
Страница 63: ...4750 PM Particulate Measurement System User Guide...