41
98-0157 Rev P
6.4.1
RO Supply Screen
Single Pass Screen
Dual Pass Screen
Figure 39
Figure 40
AUTO RINSE MIN defines the duration of initial rinse. If unit has not rinsed to quality set-point,
system will rinse for an additional minute until max time has been reached. If unit has not reached
the quality after max time elapsed an alarm is logged.
AUTO FLUSH defines the duration of flush.
TARGET RECOVERY RO1 sets target water recovery of stage 1 RO modules.
TARGET RECOVERY RO2 sets target water recovery of stage 2 RO modules.
SUPPLY HEATING defines whether the tank heater is to be used to warm the incoming water supply.
When enabled, the heater is turned on at 48°F (9 °C) and off at 52°F (11°C).
ENTER under SUPPLY TIME SCHEDULE opens to the screen shown below and enables automatic
operating times to be set. System operation is activated when TIMER is selected in the OPERATION
MENU screen.
Содержание 00MDP2-230
Страница 2: ......
Страница 61: ...59 98 0157 Rev P 9 2 1 MSP Spare Parts ...
Страница 62: ...60 98 0157 Rev P ...
Страница 63: ...61 98 0157 Rev P 9 2 2 MDP Spare Parts ...
Страница 64: ...62 98 0157 Rev P ...
Страница 66: ...64 98 0157 Rev P FLOW DIAGRAMS MSP UNITS ...
Страница 67: ...65 98 0157 Rev P MDP UNITS ...
Страница 68: ...66 98 0157 Rev P WIRING SCHEMATIC MSP UNITS ...
Страница 69: ...67 98 0157 Rev P ...
Страница 70: ...68 98 0157 Rev P ...
Страница 71: ...69 98 0157 Rev P ...
Страница 72: ...70 98 0157 Rev P ...
Страница 73: ...71 98 0157 Rev P ...
Страница 74: ...72 98 0157 Rev P ...
Страница 75: ...73 98 0157 Rev P ...
Страница 76: ...74 98 0157 Rev P MDP Units ...
Страница 77: ...75 98 0157 Rev P ...
Страница 78: ...76 98 0157 Rev P ...
Страница 79: ...77 98 0157 Rev P ...
Страница 80: ...78 98 0157 Rev P ...
Страница 81: ...79 98 0157 Rev P FX3U 4AD ADP ...
Страница 82: ...80 98 0157 Rev P ...
Страница 83: ...81 98 0157 Rev P ...
Страница 86: ...84 98 0157 Rev P ...
Страница 87: ...85 98 0157 Rev P MDP Units ...
Страница 88: ...86 98 0157 Rev P ...