background image

3.

Position top and bottom tracks parallel to each other.  Allow sufficient space to layout uprights between and per-

pendicular to tracks (see Figure 3).  Ensure correct orientation of each upright.  Slide uprights into top track and 

align with pre-drilled holes.  Attach with frame bolts (E1), flat washers (J), and frame nuts (H).  Finger tighten.  

Bring bottom track over bottom of uprights and align with pre-drilled holes.  Attach with frame bolts (E1), flat 

washers (J), and frame nuts (H).  Finger tighten.  

4.

Figure 3

For gate openings greater than 24 feet, top & bottom enclosed tracks are required to be spliced.  Align short left 

track (UL) to long right track (UR) and insert splice block as shown in Figure 2A.  Line up pre-drilled holes, 

attach with frame bolts (E1), splice bolts (E2), flat washers/lock washers (J), and frame nuts (H).  Tighten all 

nuts thoroughly.  Align long left track (LL) to short right track (LR) and insert splice block as shown in Figure 

2B.  Line up pre-drilled holes, attach with frame bolts (E1), splice bolts (E2), flat washers/lock washers (J), and 

frame nuts (H).  Tighten all nuts thoroughly. 

Figure 2A

Figure 2B

Note:  Frame bolts (E1) are used along the side of the track in conjunction with flat washer, lock washer (J) & frame nut (H) assembly. 

FLAT WASHER

LOCK WASHER

E1

Lock Washer (J)

E2

Flat Washer

TO

P

“TOP” inserts into tracks 

marked “UL & “UR”

UL

UL

Bottom Guide Track

Gates < 24’ opgs

Top & Bottom Enclosed Track

Gates > 24’ opgs

Top Enclosed Track

All Gates

UL

LR

LL

LR

A

4

4

PART # TP-II INST | 07/2018

AMERISTARFENCE.COM

  

|

  

888-333-3422

Содержание TransPornt II

Страница 1: ...t from ground elevation This screening must be included when the TransPort Gate is assembled at the jobsite Additionally all of the safety requirements of ASTM F2200 must be met during installation Fa...

Страница 2: ...NSPORT ASSEMBLY INSTALLATION INSTRUCTIONS TRANSPORT II POST SET TABLE Clear Opening Gate Out To 0ut Face to Latch Post to Center of Gate Post Suggested Location 1st Gate Post Fulcrum Post Suggested Lo...

Страница 3: ...pg 1 1 1 1 1 1 1 1 1 B Uprights 2 SQ 3 3 5 5 5 5 7 7 7 9 9 C Diagonals 2 SQ plated 2 2 4 4 4 4 6 6 6 8 8 D Pickets 1 SQ 21 27 31 37 42 48 55 59 63 73 79 E1 Frame Bolts 3 8 x 3 16 16 32 32 32 32 48 48...

Страница 4: ...rt splice block as shown in Figure 2A Line up pre drilled holes attach with frame bolts E1 splice bolts E2 flat washers lock washers J and frame nuts H Tighten all nuts thoroughly Align long left trac...

Страница 5: ...te Zipties supplied installer is responsible for attachment method Sufficient mesh is provided to also cover fence that runs parallel to gate travel path 7 Figure 4 Figure 6 Track is predrilled its en...

Страница 6: ...1 of thread above bracket 7C Install truck assembly brackets onto gateposts facing the public side of the gate utilizing u bolts provided aligning them so that gate will hang level horizontally with b...

Страница 7: ...es shall be used to provide positive attachment of the Safety Mesh to the gate leaf adjacent fence line It is recommended attaching Safety Mesh to the gate frame prior to picket or pale installation S...

Отзывы: