background image

7

7

PART # TP-II INST | 07/2018

AMERISTARFENCE.COM

  

|

  

888-333-3422

ADDENDUM TO TRANSPORT ASSEMBLY/INSTALLATION INSTRUCTIONS

METHOD FOR ATTACHING SAFETY SHIELD & SAFETY MESH

PRODUCT

DESCRIPTION

Safety Shield

3” x 1” x 18ga

Safety Shield Fasteners

1/4” x 1-1/4” x #4 Tek-Screw

Safety Mesh

6’ height vinyl-coated mesh roll

Safety Mesh Fasteners

11” Black Cable Ties

•  Safety Mesh shall be affixed to entire gate leaf and adjacent fence line.  
•  Safety Mesh attached to fence line shall exceed the length of the gate leaf in the full open position.  
•  Cable ties shall be used to provide positive attachment of the Safety Mesh to the gate leaf & adjacent fence line.  
•  It is recommended attaching Safety Mesh to the gate frame prior to picket or pale installation.

•  Safety Shield shall be affixed to gate 

mounting posts between gate leaf and gate 
mounting posts.

•  Tek-screw fasteners shall be used to provide 

positive attachment of the Safety Shield to 
the gate mounting posts.  

•  Safety Shield shall be installed in such a 

manner so that there are no voids between the 
gate leaf and gate mounting posts exceeding 
2.25 inches.

GATE LEAF

FENCE LINE

GATE MOUNTING POSTS

FENCE LINE

POST

POST

SAFETY MESH

SAFETY SHIELD

GATE MOUNTING POSTS

FENCE LINE

GATE LEAF

SAFETY SHIELD

SINGLE TRACK GATE

DUAL TRACK GATE

Содержание TransPornt II

Страница 1: ...t from ground elevation This screening must be included when the TransPort Gate is assembled at the jobsite Additionally all of the safety requirements of ASTM F2200 must be met during installation Fa...

Страница 2: ...NSPORT ASSEMBLY INSTALLATION INSTRUCTIONS TRANSPORT II POST SET TABLE Clear Opening Gate Out To 0ut Face to Latch Post to Center of Gate Post Suggested Location 1st Gate Post Fulcrum Post Suggested Lo...

Страница 3: ...pg 1 1 1 1 1 1 1 1 1 B Uprights 2 SQ 3 3 5 5 5 5 7 7 7 9 9 C Diagonals 2 SQ plated 2 2 4 4 4 4 6 6 6 8 8 D Pickets 1 SQ 21 27 31 37 42 48 55 59 63 73 79 E1 Frame Bolts 3 8 x 3 16 16 32 32 32 32 48 48...

Страница 4: ...rt splice block as shown in Figure 2A Line up pre drilled holes attach with frame bolts E1 splice bolts E2 flat washers lock washers J and frame nuts H Tighten all nuts thoroughly Align long left trac...

Страница 5: ...te Zipties supplied installer is responsible for attachment method Sufficient mesh is provided to also cover fence that runs parallel to gate travel path 7 Figure 4 Figure 6 Track is predrilled its en...

Страница 6: ...1 of thread above bracket 7C Install truck assembly brackets onto gateposts facing the public side of the gate utilizing u bolts provided aligning them so that gate will hang level horizontally with b...

Страница 7: ...es shall be used to provide positive attachment of the Safety Mesh to the gate leaf adjacent fence line It is recommended attaching Safety Mesh to the gate frame prior to picket or pale installation S...

Отзывы: