background image

GATE OU

T-

TO

-OUT

FULCRUM POST

TAIL POST

FENCE LINE

CLEAR OPENING

CANTILEVER GA

TE

FENCE POST

F

ENCE LINE

FENCE POST

SUPPLEMEN

TAL 

LA

TCH POST

GATE LA

TCH - 

(SEE STEP 

11

ON P

AGE 5)

8

Face of Latch Post to Center of Fulcrum Post

equals Clear Opening plus 8 inches

Face of Latch Post to Center of Tail Post equals 

Gate Out-To-Out Minus 8 inches

2

2

PART # TP-II INST | 07/2018

AMERISTARFENCE.COM

  

|

  

888-333-3422

TRANSPORT ASSEMBLY/INSTALLATION INSTRUCTIONS

TRANSPORT II - POST SET TABLE

Clear Opening

Gate Out-To-0ut

Face to Latch Post to Center of Gate Post

Suggested Location

1st Gate Post

(Fulcrum Post)

Suggested Location

2nd Gate Post

(Tail Post)

6’ to 8’

144.5”

Gate O 8”

136.5”

8’ to 10’

182.5”

Gate O 8”

174.5”

10’ to 12’

211”

Gate O 8”

203”

12’ to 14’

249”

Gate O 8”

241”

14’ to 16’

287”

Gate O 8”

279”

16’ to 18’

325”

Gate O 8”

317”

18’ to 20’

372.5”

Gate O 8”

364.5”

20’ to 22’

401”

Gate O 8”

393”

22’ to 24’

429.5”

Gate O 8”

421.5”

24’ to 27’

496”

Gate O 8”

488”

27’ to 30’

534”

Gate O 8”

526”

Содержание TransPornt II

Страница 1: ...t from ground elevation This screening must be included when the TransPort Gate is assembled at the jobsite Additionally all of the safety requirements of ASTM F2200 must be met during installation Fa...

Страница 2: ...NSPORT ASSEMBLY INSTALLATION INSTRUCTIONS TRANSPORT II POST SET TABLE Clear Opening Gate Out To 0ut Face to Latch Post to Center of Gate Post Suggested Location 1st Gate Post Fulcrum Post Suggested Lo...

Страница 3: ...pg 1 1 1 1 1 1 1 1 1 B Uprights 2 SQ 3 3 5 5 5 5 7 7 7 9 9 C Diagonals 2 SQ plated 2 2 4 4 4 4 6 6 6 8 8 D Pickets 1 SQ 21 27 31 37 42 48 55 59 63 73 79 E1 Frame Bolts 3 8 x 3 16 16 32 32 32 32 48 48...

Страница 4: ...rt splice block as shown in Figure 2A Line up pre drilled holes attach with frame bolts E1 splice bolts E2 flat washers lock washers J and frame nuts H Tighten all nuts thoroughly Align long left trac...

Страница 5: ...te Zipties supplied installer is responsible for attachment method Sufficient mesh is provided to also cover fence that runs parallel to gate travel path 7 Figure 4 Figure 6 Track is predrilled its en...

Страница 6: ...1 of thread above bracket 7C Install truck assembly brackets onto gateposts facing the public side of the gate utilizing u bolts provided aligning them so that gate will hang level horizontally with b...

Страница 7: ...es shall be used to provide positive attachment of the Safety Mesh to the gate leaf adjacent fence line It is recommended attaching Safety Mesh to the gate frame prior to picket or pale installation S...

Отзывы:

Похожие инструкции для TransPornt II