background image

Position diagonal braces in bays between uprights, Figure 5.  At top of center upright, 

attach the two mating diagonals using all thread bolts (F), flat washers (J), and frame 

nuts (H) as shown in Figure 4.  At all other diagonal to upright connections, attach with 

frame bolts (E1), flat washers (J), and frame nuts (H).  Tighten all nuts thoroughly.

5.

Square the gate by measuring from corner to corner on frame as shown in Figure 5. Dimensions “X” and “Y” 

should be equal (+/- ¼”) Tighten all nuts thoroughly.

6.

8.

X

Y

Figure 5

Attach safety mesh (K) to bottom 6’ of gate (Note: Zipties supplied; installer is responsible fo

r attachment 

method).  Sufficient mesh is provided to also cover fence that runs parallel to gate travel path.

7.

Figure 4

Figure 6

Track is predrilled its entire length so that pickets (D) can be attached either left or right depending on the 

direction of the gate opening.  If gate opens to the right, install pickets from left end; if gate opens to the left, 

install pickets from the right end.  Position pickets (D) to align with pre-drilled holes in tracks, attach with picket 

bolts (G) and picket nuts (I) as shown in Figure 6 & 6a.  Tighten all nuts thoroughly.  

Figure 6a

Bottom Guide Track

Gates < 24’ opgs

Top & Bottom Enclosed Track

Gates > 24’ opgs

5

5

PART # TP-II INST | 07/2018

AMERISTARFENCE.COM

  

|

  

888-333-3422

Содержание TransPornt II

Страница 1: ...t from ground elevation This screening must be included when the TransPort Gate is assembled at the jobsite Additionally all of the safety requirements of ASTM F2200 must be met during installation Fa...

Страница 2: ...NSPORT ASSEMBLY INSTALLATION INSTRUCTIONS TRANSPORT II POST SET TABLE Clear Opening Gate Out To 0ut Face to Latch Post to Center of Gate Post Suggested Location 1st Gate Post Fulcrum Post Suggested Lo...

Страница 3: ...pg 1 1 1 1 1 1 1 1 1 B Uprights 2 SQ 3 3 5 5 5 5 7 7 7 9 9 C Diagonals 2 SQ plated 2 2 4 4 4 4 6 6 6 8 8 D Pickets 1 SQ 21 27 31 37 42 48 55 59 63 73 79 E1 Frame Bolts 3 8 x 3 16 16 32 32 32 32 48 48...

Страница 4: ...rt splice block as shown in Figure 2A Line up pre drilled holes attach with frame bolts E1 splice bolts E2 flat washers lock washers J and frame nuts H Tighten all nuts thoroughly Align long left trac...

Страница 5: ...te Zipties supplied installer is responsible for attachment method Sufficient mesh is provided to also cover fence that runs parallel to gate travel path 7 Figure 4 Figure 6 Track is predrilled its en...

Страница 6: ...1 of thread above bracket 7C Install truck assembly brackets onto gateposts facing the public side of the gate utilizing u bolts provided aligning them so that gate will hang level horizontally with b...

Страница 7: ...es shall be used to provide positive attachment of the Safety Mesh to the gate leaf adjacent fence line It is recommended attaching Safety Mesh to the gate frame prior to picket or pale installation S...

Отзывы: