background image

OPERATING INSTRUCTIONS & PARTS MANUAL (OIPM) 

Folding Gate (2XZG3/2XZG4*) 

 

   

Open Position 

Right Gate Assembly

 (B) 

Left Gate Assembly

 (A) 

Locking 

Bar 

(

D

)

 

 

Locking 

Bar 

(

D

)

 

CASTER 

Caster Base 

(

C

)

 

Figure 1

 

1.  Insert the caster base (

C

) into the gate 

(

A&B

). (See Figure 

2

2XZG3 

Manufactured for Grainger International, Inc. Lake Forest, IL 60045

 

2.  Stand folded gate against the door frame 

where you intend to mount it. (See Figure 

1

3.  Mark though the mounting holes of the 

locking bar (

D

) with a pen or pencil. 

4. 

For mounting into: 

Wood: 

use 5/16” 

×

  2” Lag Bolts. 

Steel: 

drill and tap for 5/16”

 

×

 

1” Bolts. 

                Brick or concrete: 

use

 

5/16” 

×

  2” Lag Bolts Drill 3/8” 

holes, use with lead anchors. 

 

Gate (A&B) 

Figure 2

 

Caster Base (C) 

Fixing bar (E) 

5. 

Drill appropriate holes and insert the

 

appropriate bolts. 

6. Mount 

the

 

Locking Bar

 

(D)

 by inserting the bolts. 

7. Tighten 

the

 

bolts to secure

 

Locking Bar

 (

D

). (See Figure 

1

) Pull the door (

A

) into the locking 

bar (

D

), and insert a padlock. (See Figure 

1

Figure 3

 

8. 

Repeat step 3 to 8. Mount another side of the locking bar (

D

). 

9. 

Pull two door (

A&B

) together

Assemble them with bolts and nuts. 

Отзывы: