8 //
24
P/N: 630-00047 RevB 11519
Hercules II 600 Vertical Platform Lift Install Manual | www.Ameriglide.com | 866-378-6648
INSTALLING PLATFORM
INSTALLING PLATFORM
Step 1: The lift will arrive either on its back on a pallet, or standing
on a pallet. Carefully cut away and remove the shrink wrap to expose
the platform, guard panels, ramp, and lift tower.
Step 2: Unpack the platform, guard panels, ramp and smaller hardware box from the lift
tower. The mounting bolts,nuts an spacers that secure the platform to the lift carriage are
included in the small hardware pack.
Step 3: Carefully tilt the lift tower up and remove from the pallet.
Remove the top cover and the front panel from the lift tower by
removing the three Phillips head screws at the top. Set the top
cover aside. Grasp the loose panel by its sides and raise it up and
slide it to the side, freeing it from the lift frame.
Step 4: Plug the platform control box into the Controller Harness that exits the plastic chain
on the left tower. Plug lift tower into power source and, using the rocker switch on the platform
control box, carefully lower the platform carriage to the ground.
Note
If the red emergency stop button on the front of the control box is pushed in the lift will
not move. Grasp the red button and pull it straight out to disengage the emergency stop.
Содержание AMGHERC600-4
Страница 24: ...P N 630 00047 RevB 11519 ...