10 //
24
P/N: 630-00047 RevB 11519
Hercules II 600 Vertical Platform Lift Install Manual | www.Ameriglide.com | 866-378-6648
INSTALLING PLATFORM / OUTER GUARD PANEL
Step 5: Align the four platform mounting
holes with those on the lift carriage. Insert a
½
"
x 3
"
bolt into each of the lower holes. Place
the spacers between the carriage flanges and
the platform arm upper holes and insert ½
"
x 3
"
bolts. Install the low-profile lock nuts on
the upper bolts and the standard ones on the
lower bolts.
Step 6: Locate the safety pan harness
exiting from the rear of the platform and
plug it into the harness at the end of the
plastic chain in the lift tower. Secure the
platform control harness and the safety
harness under the clip at the top of the
carriage flange.
Step 7: Remove
the safety pan
bypass jumper
from the front of
the electronics box
at the top of the
lift. Verify that the
platform safety pan
is operational by
pressing up on the pan when the lift is coming
down. The lift should stop but be able to move
in the up direction.
INSTALLING OUTER GUARD PANEL
Step 1: Insert the guard
panel posts in the pockets
in the platform. The smooth
side of the guard panel faces
toward the center of the
platform.
Bolt each post in place with (2)
5
/
16
- 18 X 2
"
and
(1)
1
/
4
- 20 X 2
"
hex head bolts. If you have a 90°
exit platform, install the end guard panel using
the provided bracket and bolt to inner guard
panel.
Step 2: Install the platform
control box on the rear guard
panel using screws and nuts
through the panel.
Step 3: Install rear panel on platform by
installing guard panel posts into the pockets at
the rear of the platform and bolt in place.
Step 4: Install platform control box to rear
guard panel.
Step 5: Install front guard panel by removing
(2)
5
/
16
- 18 X 2
"
and (1)
1
/
4
- 20 X 2
"
hex head
bolts.
Содержание AMGHERC600-4
Страница 24: ...P N 630 00047 RevB 11519 ...