17 //
24
P/N: 630-00047 RevB 11519
Hercules II 600 Vertical Platform Lift Install Manual | www.Ameriglide.com | 866-378-6648
VERIFYING LIFT OPERATION
Step 1: Run the lift up and down for 5 complete cycles. Hold the direction button down and allow
the limit switches to stop the lift. At the top, verify that the platform stops level with the upper
landing. At the bottom, verify the access ramp unfolds and rests on the ground.
Step 2: Verify the Emergency Stop Switch operation. When Emergency Stop is pushed, the lift
should not run in either direction. When the switch is pulled back out, the lift should operate
normally.
Step 3: Verify the operation of the sensor pan underneath the platform.
Start with the lift at the top landing. Press up on the sensor pan. While
holding the pan in this location, press the down switch on the platform. The
lift should not run. Check all sides and middle of the safety pan.
Caution
Complete the following section before training the customer to use the lift.
VERIFYING LIFT OPERATION
Содержание AMGHERC600-4
Страница 24: ...P N 630 00047 RevB 11519 ...