7
5800 SE 78th St. Ocala, FL 34472
AP20BCF200-3-XL Installation & Operations Manual
P: (800) 327-3015
Cam-Lock Operation
The cam-lock locking device is located in the perimeter edge of all panels. Cam-Lock access holes are located on the
interior side of the panels. Generally speaking the male locks are located on the right side, top and bottom of the wall
panels.
The cam action of the lock will pull the panels together, compressing the factory applied gasket and providing an air
tight seal.
To operate the cam-lock, (as shown) insert the
panel lock wrench (located in the accessory box)
through the lock access hole and into the hex
opening in the male cam-lock.
Turn the panel lock wrench counter clockwise
to check that the locking arm is brought to a
completely open position.
Next, rotate the panel lock wrench clockwise 3/4 of
a full turn to actuate the lock engaging the locking
arm to the lock pin. The cam action of the lock will
pull the panels together, compressing the factory
applied gaskets and providing an air tight seal.
Finally, rotate the panel lock wrench approximately
1/4 turn to fully actuate the lock by securing the
cam-lock arm to the pin. Once all the cam-locks
are engaged, the access holes must be plugged
with the supplied lock hole buttons (located in the
accessory box).
Male and female cam-lock mechanisms must line-up on adjacent panels, but are able to tolerate a +/- 1/8” tolerance.
Continually check to see that the tops of the adjacent panels are evenly lined up and flush before locking.
Continually check to see that the interior seam of the panels being locked together is flush, tolerance is +/- 1/64”.
Tools Needed
Have these tools available for the installation of the AP20BCF200-3-XL.
5/16” Cam lock wrench (included in accessory box)
Tape measure
Adjustable wrench or
Refrigerant oil
Insulation tape
Sockets :
• 9/16” standard and deep well
• 7/16”
• 11/32”
Phillip head bit
Drill driver
1 1/4” hole saw for stainless steel
Level
Leak sniffer or soapy solution