Installation Details Cont.
SYSTEM PLUMBING DETAILS AND NOTES
All plumbing connections should be made with
consideration to local codes and industry standards. To
reduce line loss, all plumbing should be insulated with
adequate thermal resistance ratings
( R-values)
and with
respect to application conditions. Before connecting the
AMC chiller to an existing tank or fluid loop, the system
should be flushed to remove sediment and other
accumulation. Chillers should not be connected to water
loops with questionable accumulation. All plumbing
connections should be equip with unions easy servicing
and y-strainers for evaporator protection. Note, failing
to install a y-strainer on the entering fluid line of the
chiller will result in the loss of the factory warranty. All
strainers should contain at minimum a 30 mesh count
and must be serviced biannually or quarterly if water
conditions are harsh. Fluid lines should be flushed for 6
hours without any residue or build up in the strainer. If
build up is observed, continue flushing until conditions
are ideal. Detergents and cleaners should never be
circulated through the heat exchangers unless instructed
by American GeoThermal.
WATER TREATMENT REQUIREMENTS
Water supplies should meet the following requirements;
a) pH should be greater than 7 and less than 9
b) Total Dissolved Solids (TDS) must be less than 1000 ppm
c) Hardness as CaCO3 should be between 30 and 500 ppm
d) Alkalinity as CaCO3 should be between 30 and 500 ppm
e) Chlorides to be less than 200 ppm
f) Sulfates to be less than 200 ppm
Note, some water treatment requirements may be ignored with
the consent of American GeoThermal and the use of the no clog
type heat exchanger.
FLUID TANK
AMC CHILLER
Содержание CHILLBATCH AMC-20
Страница 7: ...6 Product Information Table 1 Physical Data 20 60 Ton Units...
Страница 8: ...7 Product Information Table 2 Physical Data 70 120 Ton Units...
Страница 9: ...8 Physical Dimensions 20 30 Ton Units...
Страница 10: ...9 Fig 1 ECM 10 12 xxxxxA 10 12 5 Ton Units Physical Dimensions 40 50 60 Ton Units...
Страница 11: ...10 Physical Dimensions 70 80 90 Ton Units...
Страница 12: ...11 Physical Dimensions 100 110 120 Ton Units...
Страница 13: ...12 Fork Lifting...
Страница 14: ...13 Lifting Via Crane...
Страница 15: ...14 Lifting Via Crane Cont...
Страница 16: ...15 Chiller Installation and Clearances...
Страница 25: ...24 System Service and Maintenance Periods Cont...
Страница 27: ...26 Winterizing Freeze Protection Cont...
Страница 28: ...27 Module Wiring Diagram...
Страница 29: ...28 Module Panel Layout...
Страница 31: ......
Страница 32: ...1037 Old Salem Road Murfreesboro TN 37127 Phone 615 890 6985 info amgeo com www amgeo com...