![American Dryer Corp. Gas/Electric/Steam AD-75HS Скачать руководство пользователя страница 49](http://html1.mh-extra.com/html/american-dryer-corp/gas-electric-steam-ad-75hs/gas-electric-steam-ad-75hs_installation-manual_2923461049.webp)
45
B. ADJUSTMENTS
7 DAYS AFTER INSTALLATION and EVERY 6 MONTHS THEREAFTER
Inspect bolts, nuts, screws, (bearing set screws), non-permanent gas connections (unions, shut-off valves,
orifices, and grounding connections). Motor and drive belts
should be
examined. Cracked or seriously
frayed belts
should be
replaced. Tighten loose V-belts when necessary. Complete operational check of
controls and valves. Complete operational check of
ALL
safety devices (door switches, lint drawer
switch, sail switch, burner and hi-limit thermostats).
Содержание Gas/Electric/Steam AD-75HS
Страница 21: ...17 ...
Страница 76: ...ADC113039 1 09 01 98 253 ...