
34
5. Steam Damper Air Piston (Flow Control) Operation Adjustment
Although the steam damper operation was tested and adjusted prior to shipping at 80 PSI, steam damper
operation
must be
checked before the dryer is put into operation. Refer to the
previous page
(page 33)
for instructions to check steam damper operation. If steam damper adjustment is necessary, locate the flow
control valve and make the necessary adjustments as noted below.
Содержание Gas/Electric/Steam AD-75HS
Страница 21: ...17 ...
Страница 76: ...ADC113039 1 09 01 98 253 ...