background image

A - Inspecting Wall Panels/Liners

Inspecting panels at this point will give you confidence that the wall panels are straight and square from the factory. When installing wall panels, you may need to 

make adjustments to the panels to accommodate for unevenness of your existing walls. During the inspection process and/or dry-fitting process, if you have any 

concerns about the alignment or fit of the wall panels, please call 1-800-454-2284 for customer service, and we will gladly assist you with your installation.

1. Find a large empty area to layout and inspect all panels.
2. Align all panels and liners to check for straightness. Make sure grout lines are straight and square

to each other.

3. Sistine Stone wall panels are made to be flexible. (Warning - Store on a flat area.) If wall panels

have been stored improperly or seemingly have become extensively bowed, they can be easily

flattened before installation 

(See trouble shooting section on last page for details).

B - Test Alignment by Dry-fitting Wall Panels/Liners

1. Place the first bottom panel          into position.

(diagram 12). 

Rest         panel on the pan floor; 

use spacers between the floor and the panel to make the top of the panel level.

2. Place the second bottom panel         into position, push the two panels together. Make sure the 

grout lines are aligned, use spacers to make the top of the panel level. Inspect the spacing 

between the wall panels and the side threshold plumb line.

3. Depending on your cement board alignment, some sanding of the wall panel edges may be

required for a tight fit.

4. Place liners          &          in position check for level and length 

(diagram 13).

5. Holding the lower panels and liners in place with screws and blocks or another person, place

the upper panels          &          into position. Check the length and overlap alignment. 

Some fitting may be required.

6. Depending on your faucet selection, you may need to mark and cut out  holes for your faucet to

fit through before you can place         or         panels into position. Remember “measure twice, 

cut once”, you can cut our walls with most cutting tools. 
(See installation video at www.americanbathfactory.com). Now you can check for level, grout 

line alignment and spacing between walls and plumb line.

WALL PANEL/LINER INSTALLATION

TIME REQUIRED

3-4 HR

diagram 13

9

diagram 12

 

C - Installing Panels 

8. Remove all dust and dirt with a clean dry cloth. This will increase the bond to the 100% RTV

silicone.

9. Start with the lower panel          apply a generous amount of 100% RTV silicone to the cement

board and to the back side of the wall panel. Also refer to the manufacturer’s recommendations

for application and drying time.

10. Press the wall firmly into position. Be sure to use spacers between the bottom panel and the

shower pan to ensure panel is level. 

(diagram 14)

 11. Install the remaining panels in the following same order as you dry-fitted the panels.

diagram 14

B races may be required to keep walls flush

7

WB2

WB2

WB2

WB1

WB2

WB1

L1

WT1

WT1

L2

WT2

WT2

WT2

L1

L2

WB1

WT1

WB2

WT2

L1

L2

WB2

Содержание Sistine Stone Neo Angle

Страница 1: ...xity of the shower unit Missing or damaged hardware and tiles should be reported within 24 hours of receiving this shipment If you need assistance call 1 800 454 2284 7 15am 4 00pm Monday thru Friday...

Страница 2: ...Threshold for Door 1 Left Right Channel Thresholds 2 SISTINE STONE WALL PANELS Left Wall Panels 2 Right Wall Panels 2 Left Solid Stone or Mosaic Liner Right Solid Stone or Mosaic Liner Panel Channel S...

Страница 3: ...commended for extra strength 11 for shampoo shelf triple studs 3 4 overhang 11 minimum gap required for the shampoo shelf diagram 2 Studs may need slight trimming to allow pan to set flush 1 2 cement...

Страница 4: ...into the pan 2 Apply a generous bead of 100 RTV silicone around the shower pan drain hole and around the outside of the drain collar 5 insert the drain collar 5 into the drain hole 3 Apply a generous...

Страница 5: ...in a zig zag pattern 3 Place the cement board against the studs and rest it inside the shower pan against the back flange Attach the cement board to the studs with screws or nails Do not screw or nail...

Страница 6: ...approximately 4 inches wide to the edge of the shower pan diagram 10 4 Place the first side threshold into position making sure to align the side rail with the vertical plumb line previously drawn on...

Страница 7: ...panels and the side threshold plumb line 3 Depending on your cement board alignment some sanding of the wall panel edges may be required for a tight fit 4 Place liners in position check for level and...

Страница 8: ...lat clear washers from the bolt 5 Start with the top hole on the glass door Place the long bolt through the hole in the door keeping the remaining rubber pieces on the bolt On the other side of the gl...

Страница 9: ...ate the header pieces and lay them out in the correct orientation on the shower pan threshold diagram 22 there will be 3 pieces If your shower is not a square then one piece will be longer than the ot...

Страница 10: ...ve you a reference point when permanently glueing in place with silicone GR E Silicone Side Panels in place 1 The glass panels and header pieces are secured with 100 RTV silicone 2 Apply a 1 4 thick b...

Страница 11: ...be sure to grout the extra hinge hole in the pan and the extra hinge hole in the stone header Also grout between the glass and the pan the glass and the wall thresholds and the glass and the stone he...

Страница 12: ...tine Stone Wall Panels are made to be flexible and may have a slight bow This condition is normal and the panels will flatten when properly installed If the panels have been stored improperly or have...

Отзывы: