background image

6

SETTING PAN

TIME REQUIRED

½ HR

5

7

CEMENT BOARD INSTALLATION

TIME REQUIRED

1-2 HRS

For best cutting results for wall panels and cement 
board, use a Makita grinder with a 4” tile blade.

apply 

100% RTV 

silicone

diagram 4

Use 1/2” thick cement board as your shower backer. Using this backer will comply with almost all city codes. A cement-based product like Wonderboard or 

Hardibacker may also be used if it meets your local codes. Some codes require a vapor barrier to be installed as well. We recommend a water/vapor barrier of 

6 mil. plastic be installed before installing the cement board. To do this, staple plastic so that it hangs 1” above the floor. Roofing nails may be used to attach 

the cement board instead of screws, this prevents the plastic from wrapping around the screws. 

1. IMPORTANT: Use your cement board as an indicator of squareness. The cement board comes in

square sheets. If you see gaps or areas where the cement board is not fitting flush, fix

the problem by removing the cement board and shimming the board until it’s square and

flush. If the seams of the cement board are not flush and square, your wall panels will not

be square and flush.

2. Cut a notch in cement board to fit around threshold. Sanding or shimmimg the 2 x 4’s at the top

rim of the pan may be required to flush the cement board. 

(diagram 5)

2. Place a bead of 100% RTV silicone on the front INSIDE face of the shower pan flange. The bead

should be in a zig-zag pattern.

3. Place the cement board against the studs and rest it inside the shower pan against the back

flange. Attach the cement board to the studs with screws or nails. Do not screw or nail into

the shower pan flange.

4. Continue installing the remaining cement boards.

1. Now that the drain is installed into the pan dry fit the pan and drain for alignment, check to

make sure the 2” drain pipe is in the center of the pan drain hole. 

(diagram 2) 

Use the drain

collar #5 by itself; remove the rubber seal, nut and gaskets from the drain assembly.

(diagram 3, previous page)

 Push the drain collar #5 into the drain hole between the pan

and the 2” pipe. With the drain collar pushed flush to the pan surface, the 2” drain pipe should

not extend past the inside threads of the drain collar #5.

2. Make sure the pan and drain fit level to the floor (the pan can be secured to the floor by nailing

the pan flange to the studs, this can only be done after step 3 is completed)

3. Remove pan and apply 100% RTV Silicone to the floor (diagram 4)

4. Carefully lift the shower pan and set into place. Make sure the ABS pipe is still centered.

5. Push and secure the rubber seal #4 onto the 2” ABS pipe.

6. Thread on the brass pressure ring #3 around the drain pipe with the provided tool #2.

Remove the tool after the brass pressure ring is installed.

7. Test and snap the decorative diamond trim plate #1 into position. (Remove the decorative trim

plate and store in secure area until installation is complete, drain will be grouted when shower is

grouted).

8. After installing pan, cover with cardboard or drop cloth to protect pan from scuffs.

notch

diagram 5

Содержание Sistine Stone Neo Angle

Страница 1: ...xity of the shower unit Missing or damaged hardware and tiles should be reported within 24 hours of receiving this shipment If you need assistance call 1 800 454 2284 7 15am 4 00pm Monday thru Friday...

Страница 2: ...Threshold for Door 1 Left Right Channel Thresholds 2 SISTINE STONE WALL PANELS Left Wall Panels 2 Right Wall Panels 2 Left Solid Stone or Mosaic Liner Right Solid Stone or Mosaic Liner Panel Channel S...

Страница 3: ...commended for extra strength 11 for shampoo shelf triple studs 3 4 overhang 11 minimum gap required for the shampoo shelf diagram 2 Studs may need slight trimming to allow pan to set flush 1 2 cement...

Страница 4: ...into the pan 2 Apply a generous bead of 100 RTV silicone around the shower pan drain hole and around the outside of the drain collar 5 insert the drain collar 5 into the drain hole 3 Apply a generous...

Страница 5: ...in a zig zag pattern 3 Place the cement board against the studs and rest it inside the shower pan against the back flange Attach the cement board to the studs with screws or nails Do not screw or nail...

Страница 6: ...approximately 4 inches wide to the edge of the shower pan diagram 10 4 Place the first side threshold into position making sure to align the side rail with the vertical plumb line previously drawn on...

Страница 7: ...panels and the side threshold plumb line 3 Depending on your cement board alignment some sanding of the wall panel edges may be required for a tight fit 4 Place liners in position check for level and...

Страница 8: ...lat clear washers from the bolt 5 Start with the top hole on the glass door Place the long bolt through the hole in the door keeping the remaining rubber pieces on the bolt On the other side of the gl...

Страница 9: ...ate the header pieces and lay them out in the correct orientation on the shower pan threshold diagram 22 there will be 3 pieces If your shower is not a square then one piece will be longer than the ot...

Страница 10: ...ve you a reference point when permanently glueing in place with silicone GR E Silicone Side Panels in place 1 The glass panels and header pieces are secured with 100 RTV silicone 2 Apply a 1 4 thick b...

Страница 11: ...be sure to grout the extra hinge hole in the pan and the extra hinge hole in the stone header Also grout between the glass and the pan the glass and the wall thresholds and the glass and the stone he...

Страница 12: ...tine Stone Wall Panels are made to be flexible and may have a slight bow This condition is normal and the panels will flatten when properly installed If the panels have been stored improperly or have...