Page
28
of
38
Pre-Start Checks
Continued
󠇠
Closed circuit corrosion inhibitor installed in all hydronic
systems
󠇠
System filled and air bled with
fresh water only
󠇠
Pipe sizing and insulation installed to limit heat loss and
vibration
󠇠
Leak check all piping
󠇠
Check system installation piping and wiring for neat visual
and quality installation
Installer Notes
Содержание ASHP-23
Страница 6: ...Page 6 of 38 Diagram Photo Copyright AusGeothermal 2018 ...
Страница 7: ...Page 7 of 38 Commercial Hot Water ...
Страница 8: ...Page 8 of 38 Hydronic Heating ...
Страница 9: ...Page 9 of 38 Hydronic Heating ...
Страница 10: ...Page 10 of 38 Hydronic Heating ...
Страница 11: ...Page 11 of 38 Swimming Pool Heating ...
Страница 20: ...Page 20 of 38 Diagram Photo Copyright AusGeothermal 2018 Heat Pump Location and Mounting Schematic ...