Page
29
of
38
Start Up Procedure
After Pre-Start checks are completed:
✓
Turn off system isolator on right hand side of the heat pump
unit
✓
Remove front left hand electrical panel on the heat pump
unit and turn on electrical circuit breakers within the heat
pump unit electrical compartment
✓
Re-fit the front left hand electrical panel and turn on heat
pump isolator. The heat pump unit control panel will now
power up and Display Main Screen Buffer Tank Temp,
Return Water Temp and Supply Water Temp
[Grab your reader’s attention with a great quote from the
document or use this space to emphasize a key point. To place this
text box anywhere on the page, just drag it.]
[Grab your reader’s attention with a great quote from the
document or use this space to emphasize a key point. To place this
text box anywhere on the page, just drag it.]
TIME Unit Stand By
Buffer T: - -
◦C
Return T: - -
◦C
Supply T: - -
◦C
Comp
↶
Up Arrow Button
Enter Button
Down Arrow Button
Alarm Button
TARGET TEMP Button
Return Button
Revvlv
Содержание ASHP-23
Страница 6: ...Page 6 of 38 Diagram Photo Copyright AusGeothermal 2018 ...
Страница 7: ...Page 7 of 38 Commercial Hot Water ...
Страница 8: ...Page 8 of 38 Hydronic Heating ...
Страница 9: ...Page 9 of 38 Hydronic Heating ...
Страница 10: ...Page 10 of 38 Hydronic Heating ...
Страница 11: ...Page 11 of 38 Swimming Pool Heating ...
Страница 20: ...Page 20 of 38 Diagram Photo Copyright AusGeothermal 2018 Heat Pump Location and Mounting Schematic ...