56
Rev. 2
SYSTEM OPERATION
GUIS/GCIS Example 4: Initial Call For High Heat, Subsequent Call To Low Heat
Timing Charts For GUIS/GCIS Two Stage
Integrated Ignition Control Operation
0 10 27 31 34 64 0 5 30 60, 90
120, or 190
Air
Circulator
Blower
Gas Valve
Ignitor
Pressure
Switches
Induced Draft
Blower
Thermostat
High
Low
Off
On
Off
On
Off
PS2 Closed
PS1 Closed
Open
High
Low
Off
High
Low
Off
0 10 27 31 34 64 0 5 30 60, 90
120, or 190
Air
Circulator
Blower
Gas Valve
Ignitor
Pressure
Switches
Induced Draft
Blower
Thermostat
High
Low
Off
High
Low
Off
On
Off
PS2 Closed
PS1 Closed
Open
High
Low
Off
High
Low
Off
Call Change to High Heat
Call Change to Low Heat
30 Seconds After Call Change to Low Heat
GUIS/GCIS Example 3: Initial Call For Low Heat, Change In Call To High Heat
Содержание GCIA045A30
Страница 34: ...BLOWER PERFORMANCE SPECIFICATIONS 34 Rev 2...