
Operating Manual GC 5000 BTX; Version 5 – 11/2010
59
9.5.3 How to start validation
Configure the type of tests the system should do:
1. Select the menu item “Validation setup”
Menu bar
Parameters
Validation setup
2. Click on the relevant boxes the type of tests which should run:
Zero gas check
It checks for memory effect or contamination
Drift check
It checks for a deviation between the original span
value and the current span value
Deviation value
It checks for a deviation between two current span
values
Run auto-validation
If a validation shall start automatically either after a
number of cycles or at a definite time.
3. Select the zero gas supply and the span gas supply:
These items select the corresponding inputs when using calibration
valves or the corresponding levels when using a calibration module.
4. Select the relevant components for the validation
Menu bar
Select components
1. Step:
Configuration
4 types of
validation tests
Содержание The GC 5000 BTX
Страница 1: ...Operating Manual Gas chromatograph GC 5000 BTX...
Страница 15: ...Operating Manual GC 5000 BTX Version 5 11 2010 13 Fig 2 Rear view Fig 3 Gas regulation inside the analyzer...
Страница 35: ...Operating Manual GC 5000 BTX Version 5 11 2010 33 Fig 5 Connection of analog outputs...
Страница 101: ...Operating Manual GC 5000 BTX Version 5 11 2010 99 Purging of sample line Sampling Waiting for GC Ready...
Страница 102: ...Operating Manual GC 5000 BTX Version 5 11 2010 100 Injection Waiting for end of cycle time...
Страница 104: ...Operating Manual GC 5000 BTX Version 5 11 2010 102 Purging of sample line Sampling Waiting for GC Ready...
Страница 105: ...Operating Manual GC 5000 BTX Version 5 11 2010 103 Injection Waiting for end of cycle time...