![Alvarion BreezeMAX PRO-S CPE Скачать руководство пользователя страница 80](http://html1.mh-extra.com/html/alvarion/breezemax-pro-s-cpe/breezemax-pro-s-cpe_product-manual_2915112080.webp)
58
BreezeMAX CPEs Product Manual
Chapter 3 - Commissioning
3.1
Commissioning Steps
After completing the installation process, as described in the preceding chapter,
several actions should be performed to ensure connectivity with the Base Station
and provisioning of services. After the SU is connected with the Base Station, it
can be fully managed via the wireless link from the Base Station or a central
management system:
1
The basic parameters must be configured to ensure that the unit operates
correctly and can communicate with the Base Station.
2
The antenna must be aligned to ensure optimal performance of the wireless
link.
3
Proper operation should be verified, including data connectivity.
Содержание BreezeMAX PRO-S CPE
Страница 1: ...BreezeMAX CPEs Product Manual SW Version 4 5 May 2008 P N 214974...
Страница 12: ......
Страница 20: ...xx BreezeMAX CPEs Product Manual Figures Figure A 2 Web Configuration Main Menu Pocket PC PDA 119...
Страница 40: ......
Страница 78: ......
Страница 145: ...B Appendix B Troubleshooting In This Chapter Si CPE Troubleshooting on page 124 PRO S CPE Troubleshooting on page 128...
Страница 162: ......