![Alvarion BreezeMAX PRO-S CPE Скачать руководство пользователя страница 59](http://html1.mh-extra.com/html/alvarion/breezemax-pro-s-cpe/breezemax-pro-s-cpe_product-manual_2915112059.webp)
Installing the Si CPE
BreezeMAX CPEs Product Manual
37
Figure 2-12: Si CPE Top View (Without RF Connector's Cover)
Table 2-7: Si CPE Top Panel Components
Name
Description
Functionality
STATUS S
tatus Indication
Off - CPE is not powered or power failure
Green - CPE is connected with a base station
Red - CPE failure
Orange - After power-up (if power supply is ok) until start of
self test, after passing self-test until network entry is
completed, or upon restarting the network entry process.
Blinking Orange - CPE is being set to Factory Defaults (during
6 seconds after pressing the RESET button for more than 5
seconds. The RESET button is not available in new units with
RF Version 11 ).
Blinking Green - If SIGNAL LEDs 5, 6 and 7 are on:
Authentication reject by RADIUS server.
If SIGNAL LEDS 6 and 7 are on: Rejected by Base Station
(Duplicate SU Name in database).
If LED 7 is on: Authentication Timeout, re-authentication failure
(connection to RADIUS server lost
or Shared Secret
mismatch
).
Содержание BreezeMAX PRO-S CPE
Страница 1: ...BreezeMAX CPEs Product Manual SW Version 4 5 May 2008 P N 214974...
Страница 12: ......
Страница 20: ...xx BreezeMAX CPEs Product Manual Figures Figure A 2 Web Configuration Main Menu Pocket PC PDA 119...
Страница 40: ......
Страница 78: ......
Страница 145: ...B Appendix B Troubleshooting In This Chapter Si CPE Troubleshooting on page 124 PRO S CPE Troubleshooting on page 128...
Страница 162: ......