Chapter 3 - Commissioning
Operation Verification
BreezeMAX PRO 5000 CPE
40
Product Manual
3.5
Operation Verification
To verify proper operation of the PRO CPE, examine the LED indicators on the IDU
(see
).
To verify proper connection to the end-user's data equipment, examine the
Ethernet Integrity and Ethernet Activity LEDs of the Ethernet connectors.
To verify data connectivity, from the end-user's PC or from a portable PC
connected to the unit, ping a known device in the network, or connect to the
Internet.
NOTE
Verifying the correct operation of the ODU using the SAU LEDs is meaningful only after the
configuration and alignment processes are completed, and the unit is synchronized with a BS.
Содержание BreezeMAX PRO 5000 CPE
Страница 1: ...BreezeMAX PRO 5000 CPE Product Manual Software Version 1 5 April 2010 P N 215643...
Страница 17: ...Tables BreezeMAX PRO 5000 CPE xvii Product Manual Table 4 3 CPE Parameters Summary 85...
Страница 18: ...1 Chapter Product Description...
Страница 27: ...2 Chapter Installation...
Страница 46: ...3 Chapter Commissioning...
Страница 58: ...4 Chapter Operation...
Страница 105: ...A Appendix Troubleshooting...
Страница 106: ...Appendix A Troubleshooting BreezeMAX PRO 5000 CPE 89 Product Manual In This Appendix CPE Troubleshooting on page 90...
Страница 109: ...Glossary...