Chapter 3 - Commissioning
Commissioning Steps
BreezeMAX PRO 5000 CPE
31
Product Manual
3.1
Commissioning Steps
After completing the installation process, as described in the preceding chapter,
several actions should be performed to ensure connectivity with a BTS and
provisioning of services. After the CPE is connected with a BTS, it can be fully
managed via the wireless link:
1
The basic parameters must be configured to ensure that the unit operates
correctly and can communicate with a BTS.
2
The antenna must be aligned to ensure optimal performance of the wireless
link.
3
Proper operation should be verified, including data connectivity.
Содержание BreezeMAX PRO 5000 CPE
Страница 1: ...BreezeMAX PRO 5000 CPE Product Manual Software Version 1 5 April 2010 P N 215643...
Страница 17: ...Tables BreezeMAX PRO 5000 CPE xvii Product Manual Table 4 3 CPE Parameters Summary 85...
Страница 18: ...1 Chapter Product Description...
Страница 27: ...2 Chapter Installation...
Страница 46: ...3 Chapter Commissioning...
Страница 58: ...4 Chapter Operation...
Страница 105: ...A Appendix Troubleshooting...
Страница 106: ...Appendix A Troubleshooting BreezeMAX PRO 5000 CPE 89 Product Manual In This Appendix CPE Troubleshooting on page 90...
Страница 109: ...Glossary...