Chapter 3 - Commissioning
Aligning the PRO CPE’s Internal Antenna
BreezeMAX PRO 5000 CPE
35
Product Manual
3.3
Aligning the PRO CPE’s Internal Antenna
3.3.1
SU Alignment Unit (SAU)
The miniature SU Alignment Unit can be used during installation and testing to
support an easy process of antenna alignment and provide the ODU's status
indications.
1
Remove the sealing cap of the ODU's SAU connector.
2
Connect the cable attached to the SAU to the SAU connector.
3
After completing the installation, disconnect the cable and replace the cap.
Use appropriate sealing material to protect the connection against moisture and
humidity. Use removable sealing material, such as a tar seal, to enable future
access to the connector.
To connect the SAU to the ODU:
Figure 3-2: SAU
Содержание BreezeMAX PRO 5000 CPE
Страница 1: ...BreezeMAX PRO 5000 CPE Product Manual Software Version 1 5 April 2010 P N 215643...
Страница 17: ...Tables BreezeMAX PRO 5000 CPE xvii Product Manual Table 4 3 CPE Parameters Summary 85...
Страница 18: ...1 Chapter Product Description...
Страница 27: ...2 Chapter Installation...
Страница 46: ...3 Chapter Commissioning...
Страница 58: ...4 Chapter Operation...
Страница 105: ...A Appendix Troubleshooting...
Страница 106: ...Appendix A Troubleshooting BreezeMAX PRO 5000 CPE 89 Product Manual In This Appendix CPE Troubleshooting on page 90...
Страница 109: ...Glossary...