57
Gutter and Downpipe Installation
14
Diagram 68
Diagram 69
25mm Screw
With help position your gutter
on the side face of the eaves
bars, this should be the same
length as the eaves bar and fit
between the ends of the roof
corner bars. Fix it in place with
25mm screws, diagram 68.
Fit the plastic pipe insert in the end of
the gutter you want your down pipe to
run out of (diagram 69). Use a small
amount of silicone to seal this in place.
Go to the next page to see how the
downpipe can be installed.
D201
Gutter Parts
Part Name
Part
Number
Qty
Gutter:
2
6ft long
EV0621M
8ft long
EV0622M
10ft long
EV0623M
12ft long
EV0624M
Bracket
EV0740M 4
Stop end RH
EV0535M 2
Stop end LH
EV0536M 2
Downpipe Outlet
D201 2
Downpipe Shoe
D207 6
Rubber Blank
D214 2
Содержание VICTORIAN CHELTENHAM 8x10
Страница 1: ...07 14 09 14...
Страница 39: ...39 Half Board Installation 10 EV0598 EV0550 External Diagram 49...
Страница 41: ...41 Half Board Installation 10 Dia 51 Diagram 51 EV0599 EV0551 EV0551 EV0599 Diagram 50...
Страница 63: ...63 Finished installation 17...
Страница 66: ...66 Parts Lists See Universal booklet for part lists...
Страница 67: ...67 Notes...