52
Glazing
12
Once all the glazing has been finished you can
install the ridge cover cap. This is a universal
part that can be used with either cedar or
aluminium capping. Simply place this on top
of the ridge bar and fix in place using 25mm
screws though the pre-drilled holes.
40mm Screw
Ridg
e Co
ver C
ap
Ridg
e Co
ver C
ap
Aluminium capping option
Cedar capping option
Diagram 59
Diagram 59
EV
06
94
M
EV
05
94
Dia. 59
Содержание VICTORIAN CHELTENHAM 8x10
Страница 1: ...07 14 09 14...
Страница 39: ...39 Half Board Installation 10 EV0598 EV0550 External Diagram 49...
Страница 41: ...41 Half Board Installation 10 Dia 51 Diagram 51 EV0599 EV0551 EV0551 EV0599 Diagram 50...
Страница 63: ...63 Finished installation 17...
Страница 66: ...66 Parts Lists See Universal booklet for part lists...
Страница 67: ...67 Notes...