13
Rear Assembly
5
Pilot
hole
here
Dia. 9
EV0507
EV
04
83
40m
m Sc
rew
Diagram 10
Internal
Dia. 10
EV0465
EV0466
30mm
45mm
EV0466
Diagram 9
Once the side corner bars are secure slot
the above purling glazing bars into place.
With all of the gable bars in place drill pilot
holes through the lap joints at the end of
each bar. The holes should be drilled
centrally to the bar and spaced out as
shown in diagram 9.
Now slot the two roof corner bars into
place, these should be secured with 40mm
screws, diagram 10.
EV
04
83
EV
04
82
Internal
Internal
Содержание VICTORIAN CHELTENHAM 8x10
Страница 1: ...07 14 09 14...
Страница 39: ...39 Half Board Installation 10 EV0598 EV0550 External Diagram 49...
Страница 41: ...41 Half Board Installation 10 Dia 51 Diagram 51 EV0599 EV0551 EV0551 EV0599 Diagram 50...
Страница 63: ...63 Finished installation 17...
Страница 66: ...66 Parts Lists See Universal booklet for part lists...
Страница 67: ...67 Notes...