50
Glazing
12
Now complete the glazing by fitting the roof
panes. Slide these all the way up the glazing
bars, making sure they tuck into the groove in
the ridge. Slot 2 of the glass stops (diagram
55,57) on and lower the pane down onto the
eaves bar. This will now support itself while
you fix the capping in place. As with the sides
work in a loop around the building. The
capping for the roof corners is wider than
normal to cover the join of the cover strip to
the roof corner glazing bar. The capping
should also be fitted flush with the bottom
edge of the glass at the eaves.
Содержание VICTORIAN CHELTENHAM 8x10
Страница 1: ...07 14 09 14...
Страница 39: ...39 Half Board Installation 10 EV0598 EV0550 External Diagram 49...
Страница 41: ...41 Half Board Installation 10 Dia 51 Diagram 51 EV0599 EV0551 EV0551 EV0599 Diagram 50...
Страница 63: ...63 Finished installation 17...
Страница 66: ...66 Parts Lists See Universal booklet for part lists...
Страница 67: ...67 Notes...