![Alton VICTORIAN CHELTENHAM 8x10 Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/alton/victorian-cheltenham-8x10/victorian-cheltenham-8x10_instruction-manual_2912749007.webp)
7
Base Assembly
3
EV03
05M
EV0613M
EV
03
05
M
EV061
2M
Lay out your aluminium base sections as the diagram
shows. Use the crop head bolts in the bolt channels for
attaching the base brackets (D174M), diagram 1. The base
brackets should always be positioned either side of the
door, in the corners, in the middle of the rear and equally
spaced down the sides. Use the joining bracket in each
corner with a standard bolt to join the sections (diagram 1).
The top holes will take a 25mm screw when the side cills
are fixed to it. Look for the length of building you have in
the table below to check what you should be using.
NB. For Extensions refer to separate manual.
6ft long
Part Name
Part
Number
Size
(mm)
Qty
Front
EV0612M 653 2
Side
EV0303M 1846 2
Rear
EV0613M 2519 1
Joining Bracket
EV0311M - 4
Base Bracket
D174M - 9
8ft long
Part Name
Part
Number
Size
(mm)
Qty
Front
EV0612M 653 2
Side
EV0304M 2476 2
Rear
EV0613M 2519 1
Joining Bracket
EV0311M - 4
Base Bracket
D174M - 9
10ft long
Part Name
Part
Number
Size
(mm)
Qty
Front
EV0612M 653 2
Side
EV0305M 3106 2
Rear
EV0613M 2519 1
Joining Bracket
EV0311M - 4
Base Bracket
D174M - 11
12ft long
Part Name
Part
Number
Size
(mm)
Qty
Front
EV0612M 653 2
Side
EV0306M 3736 2
Rear
EV0613M 2519 1
Joining Bracket
EV0311M - 4
Base Bracket
D174M - 11
example
8 x 10
example
EV061
2M
EV0311M
D174M
EV06
12M
EV0305
M
Internal
Diagram 1
Dia. 1
D174M
Содержание VICTORIAN CHELTENHAM 8x10
Страница 1: ...07 14 09 14...
Страница 39: ...39 Half Board Installation 10 EV0598 EV0550 External Diagram 49...
Страница 41: ...41 Half Board Installation 10 Dia 51 Diagram 51 EV0599 EV0551 EV0551 EV0599 Diagram 50...
Страница 63: ...63 Finished installation 17...
Страница 66: ...66 Parts Lists See Universal booklet for part lists...
Страница 67: ...67 Notes...