Roof Assembly
9
Again with a helper
supporting the other
end of the ridge, locate
the extension end of
the ridge to the end of
the first ridge, then do
the same at the other
end with the rear
gable.
Drill a pilot hole
through the bottom
tenon of the extension
ridge and through the
roof bars. Fix the roof
bars first with 80mm
screws, pulling them in
tight to the ridge. Then
fix the ridge joint with
a 100mm screw, this
will go all the way
through to the top of
the first ridge section
making sure this can’t
be pulled out.