17
Extension Assembly
7
Dia. 24
Dia. 23
50mm S
crew
EV0498
EV0498
EV0498
EV04
23
Stan
dard
Eave
s Bar
EV01
76
25m
m Scre
w
Stand
ard
Cill
Diagram 23
Diagram 24
Next fit the side extension bar, first slot the
tenon on the end of the bar into the mortise
in the cill. Slot the top into position, lining
the edge of the bar up with the joint of the
two eaves bars. Secure this with a two
50mm screw and the secure the bottom
with two 25mm screw., remember to drill a
pilot hole first.
Diagram 25
Internal
Internal