36
Mid Rail Installation
10
Slot the mid rail onto the rear of the greenhouse. Drill pilot holes in the rear side bars from the inside of
the building and fix with 50mm CSK screws, diagram 58. Then drill pilot holes in the corner bars and fix
with 80mm CSK screws, diagram 59. The front rails adjacent to the porch can now be attached in a
similar manner (8’ = EV0902 / EV0903, 12’ EV0904 / EV0905).
Once the greenhouse frame is up and secured to the
aluminium base using 25mm Pan Heads you can install
the mid rails, starting with the rear side.
8ft long
Part Name
Part
Number
Size
(mm)
Qty
Front R
EV0424
576
1
Front L
EV0425
576
1
End Gable
EV0432 1959
2
8’ Side
EV0438 2564
1
1’ LH Mid
EV0902
329
2
1’ RH Mid
EV0903
329
2
Part
Number
Size
(mm)
Qty
EV0424 576 1
EV0425 576 1
EV0432 1959 2
12ft long (shown)
Part Name
Front R
Front L
End Gable
12’ Side
EV0440 3824
1
1’ LH Mid
EV0902
329
1
1’ RH Mid
EV0903
329
1
3’ LH Mid
EV0904
960
1
3’ RH Mid
EV0905
960
1
Dia. 59
EV0501
Side
Mid R
ail
Diagram 58
50mm Sc
rew
Internal
EV0502
Side
Mid R
ail
Diagram 59
80mm S
crew
Internal
Dia. 58
Dia. 59