![Alton DURHAM PORCH HB Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/alton/durham-porch-hb/durham-porch-hb_instruction-manual_2912730014.webp)
14
5
Dia. 9
EV0505
EV
04
81
40m
m Sc
rew
Diagram 10
Internal
Dia. 10
30mm
45mm
EV0505
Diagram 9
Now slot the two roof corner bars into
place, these should be secured with 40mm
Pan Head screws (EV0332), diagram 10.
EV
04
81
EV
04
80
Internal
Internal
EV0460
End Gable Assembly
Pilot
hole
here
Once the side corner bars are secure slot
the above purling glazing bars into place.
With all of the gable bars in place drill pilot
holes through the lap joints at the end of
each bar. The holes should be drilled
centrally to the bar and spaced out as
shown in diagram 9.