Inspect stove pipe at least twice
monthly for creosote buildup.
Creosote creates a risk of chimney
fire, and can obstruct stove pipe. An
obstructed stove pipe can result in
CO buildup in your boiler room.
Fir s of low int nsity, or low smold ring fier s ar
lik ly to produc cr osot buildup. Tars and oth r
organic vapors combin with moistur from th fu l
and from combustion byproducts to form cr osot .
The mor tim th boil r is fier d with wood at low
fier , th mor opportunity for buildup of cr osot
insid th stov pip and chimn y. Insp ct at l ast
twic monthly, and r mov if buildup occurs.
Manual Dampers must not be
installed in the flue pipe. Improper
operation could result in death.
If cr osot has accumulat d it should b r mov d
to r duc th risk of a chimn y fier
Us 24 gaug or h avi r singl wall stov pip in
op n ar as no clos r than 18 inch s from walls or
c iling. If th stov pip must b clos r than 18
inch s from th n ar st wall or c iling, or if it must
go through walls, clos ts, or box d in ar as, th n UL
list d insulat d stov pip must b us d. Pip that
runs along th outsid walls of a building must also
b UL list d insulat d pip , v n if it runs along a
non-combustibl outsid wall. Theis r quir m nt is in
plac in ord r to pr v nt cooling of th stov pip
which in turn cools th rising smok and caus s
cr osot to form quickly. The diam t r of stov pip
must b at l ast 6 inch s.
Stovepipe Specifics for SE210
Wh n plumbing th stov pip from th boil r to
th chimn y it installing an 18”-24” pi c of 6”
straight pip dir ctly to th boil r b for any
lbows/”T”s. Theis will allow mor ar a for ash to
s ttal and incr as cl aning int rvals to v ry 3
months v rsus
every month
if an lbow/”T” is
conn ct d dir ctly to th boil r with no straight
pi c b for .
It is also r comm nd d to us a “T” wh r any
lbows would b us d to allow for asy cl aning.
Theis is sp cially tru for th lbow at th boil r. Theis
“T” should b install d so that th capp d off
op ning is horizontal, facing th back (not down).
Sinc th Wood Gun produc s its own drafte th
stov pip will b und r a positiv pr ssur and
smok and dust will scap from any hol s and
cracks in th stov pip . Pl as s al all joints and
scr ws with 100% silicon to pr v nt smok and dust
scaping.
Wall Pass-Through: United States
In th U.S., th national cod is NFPA 211. Whil
many localiti s adopt this standard, b sur to ch ck
with local authoriti s b for b ginning your
installation. The NFPA (National Fir Prot ction
Association) p rmits four m thods for passing
through a combustibl wall. A commonly us d
m thod to pass through a wall dir ctly to a masonry
chimn y is to cl ar a minimum 12"(300 mm) around
th ntir chimn y conn ctor, and fiell it with brick
masonry which is at l ast 3.5"(90 mm) thick. A fier -
clay lin r, minimum 3/8" (9 mm) wall thickn ss must
run through th brick wall to th chimn y lin r (but
not b yond th inn r surfac of th lin r). It must b
c m nt d in plac with r fractory c m nt. Theis
m thod is illustrat d. For d tails on th oth r thr
options, r f r to th most r c nt dition of th NFPA
211 cod .
- 14 -
Содержание WOOD GUN Super E210
Страница 2: ......
Страница 57: ...Appendix B Wiring Diagrams 51 ...
Страница 58: ...Appendix C Exploded Parts Drawings 52 ...
Страница 59: ... 53 ...
Страница 60: ... 54 ...
Страница 66: ...Appendix F Boiler Piping and Ducting Examples 60 ...
Страница 67: ...Wood Gun Air Inlet Ducting Installations 61 ...
Страница 70: ...APPENDIX G Markings 64 ...
Страница 71: ...Datalabel 65 ...