![Alternate Heating WOOD GUN Super E210 Скачать руководство пользователя страница 32](http://html.mh-extra.com/html/alternate-heating/wood-gun-super-e210/wood-gun-super-e210_installation-and-operators-manual_2910961032.webp)
OIL BURNER ASSEMBLY
General Information
If an oil burn r is suppli d with th Wood Gun™,
conn ction of fu l lin s and th adjustm nt of th
burn r should b don by a qualifie d oil burn r
t chnician.
The oil burn r is normally shipp d d tach d from
th Wood Gun™ in a s parat box. R f r to th Ri llo
Burn rs Installation Manual includ d with your
shipm nt for instructions on confieguring th burn r.
Particular atta ntion should b paid to th Oil Lin
Conn ctions s ction of th Ri llo Installation
Manual. Ensur that th corr ct siz nozzl is in
plac on th burn r b for installing on th boil r.
The corr ct nozzl siz for th Ri llo Oil Burn rs
install d in th Sup r E210 is 0.65 gph, 45º, s mi-
solid.
Oil/Gas Burner Combustion Chamber
The Sup r E210 has an oil burn r combustion
chamb r that is n d d to us an oil burn r, which is
xt rior to th boil r and locat d on th right hand
sid of th boil r wh n vi w d from th front. To
mount th combustion chamb r, apply th nclos d
pi c of 1/8 in x 1/2 in s lf-stick silicon strip to th
combustion chamb r flaang just insid of th bolt
hol s. Attaach th combustion chamb r to th flaang
on th boil r using six 5/16 in x 1 in bolts and
wash rs. The m tal jack t cov r and insulation on
th combustion chamb r must b r mov d to gain
acc ss to th hol s in th flaang as shown b low.
Super E210 Combustion Chamber
Afte r s curing th combustion chamb r to th
boil r, r plac th insulat d jack t. Bolt th burn r
mounting flaang into plac using 4, 3/8 x 1 1/4” bolts,
wash rs and lock wash rs. Ensur that th gask t
that is furnish d with th burn r is plac d b tw n
th flaang of th Wood Gun™ and th mounting
- 26 -
Содержание WOOD GUN Super E210
Страница 2: ......
Страница 57: ...Appendix B Wiring Diagrams 51 ...
Страница 58: ...Appendix C Exploded Parts Drawings 52 ...
Страница 59: ... 53 ...
Страница 60: ... 54 ...
Страница 66: ...Appendix F Boiler Piping and Ducting Examples 60 ...
Страница 67: ...Wood Gun Air Inlet Ducting Installations 61 ...
Страница 70: ...APPENDIX G Markings 64 ...
Страница 71: ...Datalabel 65 ...