![Alternate Heating WOOD GUN Super E210 Скачать руководство пользователя страница 65](http://html.mh-extra.com/html/alternate-heating/wood-gun-super-e210/wood-gun-super-e210_installation-and-operators-manual_2910961065.webp)
Index of Photos and Illustrations
3-2-10 Rule for Chimneys........................................10
Dwyer Manometer...................................................11
Stove pipe passing through wall..............................15
U.S. Wall Pass-Through..........................................15
Canadian Wall Pass-Through..................................15
Pressure Relief Valve...............................................18
Pressure regulating valve and back-flow prevention
valve configuration...................................................19
Three Mixing Valve: Return Water Protection.........19
Photo: Low Water Cutoff Installation.....................20
Plumbing – Coil in Series........................................25
Plumbing – Coil in Parallel.....................................25
..................................................................................25
Figure: Domestic Coil Tempering Valve..................25
Plumbing – Coil with circulator..............................25
..................................................................................25
..................................................................................26
Super E210 Combustion Chamber..........................26
Air Valve Gasket......................................................39
Air Valve Motor Clamp Alignment.........................40
Air Valve Disk in Open Positioning........................40
Door Hinge Plate Adjustment..................................41
Door Latch Shims.....................................................41
Load Door with Old Seal Removed and High
Temperature Silicone................................................41
Load Door with Fiberglass Braid Tape....................41
Load Door with Fiberglass Braid Tape and More
High Temperature Silicone.......................................42
Adding Preformed Silicone Bead to Door...............42
Marking to Trim......................................................42
Trimming Preformed Silicone Bead.........................42
Adding High Temperature Silicone to Butt Joint of
Trimmed Bead..........................................................42
Finished Joint..........................................................42
Reinforcing Corners with High Temperature Silicone
..................................................................................43
Finishing the Corners..............................................43
Finished, Level Bead...............................................43
Front Inspection Door.............................................43
Direct-drive fan attached to boiler..........................44
Mark Assembly Orientation....................................44
Fan Hub Set Screws.................................................44
One Inch Nut for Pulling Fan..................................45
Jaw Puller at the Ready...........................................45
AHS Fan Puller Tool...............................................45
AHS Fan Puller Tool at the Ready..........................45
Separate Heat Shield from Motor Mount Plate.......45
Closeup of Motor Mounting Bolts..........................45
Motor Frame Assembly Bolts.................................46
Loosening Motor End Shield from Motor...............46
Lifting the End Shield with Armature.....................46
Loosening Screws Securing Bearing to End Shield46
Jaw Puller at the Ready on Motor Bearing.............47
AHS Bearing Puller..................................................47
Wood Gun Air Inlet Ducting Installations................61
Wood Gun in Primary/Secondary System................62
Operating an Alternate Heating Systems Boiler in
Tandem with Existing Boiler....................................63
- 59 -
Содержание WOOD GUN Super E210
Страница 2: ......
Страница 57: ...Appendix B Wiring Diagrams 51 ...
Страница 58: ...Appendix C Exploded Parts Drawings 52 ...
Страница 59: ... 53 ...
Страница 60: ... 54 ...
Страница 66: ...Appendix F Boiler Piping and Ducting Examples 60 ...
Страница 67: ...Wood Gun Air Inlet Ducting Installations 61 ...
Страница 70: ...APPENDIX G Markings 64 ...
Страница 71: ...Datalabel 65 ...