Maintenance
Disassembly and assembly of the GCB equipments
G51--500EN01
7/10
02--2011
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is
strictly prohibited.
GRID
Remove of the VT’s equipped ,
Remove
the equipments
remove the fuse if necessary
(bolts F1)
.
Mark the location and remove the VT’s if necessary
(bolts G1)
.
.
G
.
F
1
1
2
.
G
.
F
x4
H M8--20
.
G1
x4
CHC M4--10
.
F1
.
F1
.
F1
.
G1
Continued on next page.
Содержание FKG1X
Страница 2: ......
Страница 7: ...GRID High Voltage Switchgear This page is intentionally blank...
Страница 13: ...GRID High Voltage Switchgear This page is intentionally blank...
Страница 17: ...GRID High Voltage Switchgear This page is intentionally blank...
Страница 21: ...GRID High Voltage Switchgear This page is intentionally blank...
Страница 75: ...This page is intentionally blank This page is intentionally blank...
Страница 191: ...GRID ALSTOM Grid SAS 130 rue L on Blum 69611 Villeurbanne France This page is intentionally blank...
Страница 197: ...GRID ALSTOM Grid SAS 130 rue L on Blum 69611 Villeurbanne France This page is intentionally blank...